Process of Bridging Claims

 

The bridging scheme was originally introduced as a temporary measure during turn-around maintenance (TAM) wherein government sought to encourage and support marketers in transporting petroleum products nationwide.

Although bridging was meant to be a temporary solution until the refineries were producing back at full capacity, the state of the refineries has worsened over the years.

In addition, pipeline vandalisations by militants and economic saboteurs have been on the increase, to the point where trucks have become the major source of distributing petroleum products in recent times.

The initial projection was to have a maximum of 10% of total petroleum products bridged while the remaining portion will be pumped through the pipelines. However, trend analysis indicate that bridging of products have consistently increased over the years to about 40%.

There is also a noticeable trend whereby products are bridged from Lagos to the South East and South-South areas of the country to address products unavailability from the refineries in Port Harcourt and Warri.

 

CHECKLIST FOR THE PROCESSING OF BRIDGING CLAIMS FROM PPMC DEPOTS

 

  • Bridging Acknowledgement Form (endorsed by the Depot Representative)
  • Letter of request for payment of claim by the marketer
  • Meter Ticket
  • PEF(M)B loading and receiving stamps duly signed and dated by PEF(M)B depot representative
  • Bridging Approval (original should be submitted at the expiration of the loading period) – photocopies submitted before the expiration must be stamped and endorsed by PEF(M)B depot representative.
  •  DPR stamps at loading and receiving depots
  •  NNPC stamps at loading and receiving depots
  •  Evidence of payment of NTA (for those within contribution zones)
  •  Bridging Note
  •  Marketers Waybill
  •  Form BR/RD II – where applicable
  •  Product Out-Turn Report/Form (in the letter-headed paper of the outlet (station) and duly stamped and signed by the Station Manager), confirming that the product was discharged at the outlet.
  •  DPR’s Depot Representative endorsement at the receiving depot where product are directed to be discharged at third party outlet.
  •  PEF(M)B reserves the right to change any of the above without prior notice.

 

CHECKLIST FOR THE PROCESSING OF BRIDGING CLAIMS FROM DAPPMA FACILITIES

 

  •  Bridging Acknowledgement Form (endorsed by the Depot Representative)
  •  Letter of request for payment of claim by the marketer
  •  Meter Ticket
  •  PEF(M)B loading and receiving stamps duly signed and dated by PEF(M)B depot representative
  •  Evidence of payment of NTA (for those within contribution zones)
  •  DPR stamps at loading and receiving depots
  •  Bridging Note
  •  Marketers Waybill and Invoice
  •  NNPC stamp at loading and receiving depot
  •  Form BR/RD II – where applicable
  •  Product Out-Turn Report/Form (in the letter-headed paper of the outlet (station) and duly stamped and signed by the Station Manager), confirming that the product was discharged at the outlet.

DPR’s Depot Representative endorsement at the receiving depot where product are directed to be discharged at third party outlet.

NOTE:

  • Products must be delivered within ten (10) days of lifting.
  • Case(s) of breakdown and final date of delivery of product should be reported.
  • PEF(M)B reserves the right to change any of the above without prior notice.