This workstream entails establishing an Operations Command & Control (OCC) centre to monitor the Board’s field operations in real-time and improve the response time to incidents.

CURRENT STATUS

  • The Operation Command & Control centre is 90% completed with OCC TV screens, A/C units, UPS and Computers system amongst other electrical gadgets have been installed.

DATA CENTRE UPGRADE

This workstream entails upgrading the Information Technology and Network Infrastructure at the HQ and Zonal Offices. This is to improve speed and strong connectivity and also reduce network downtime. 

CURRENT STATUS

  • Installation of the Data centre and Network Infrastructure Equipment for the PEF(M)B HQ is completed.
  •  Installation of the Data Centre Infrastructure Management (DCIM) equipment for the secondary data disaster recovery at main-one collocation centre completed.
  • Permanent Secondary Data Centre site-building preparations located at the Lagos Zonal Office is in progress